Description
Now engineers, mathematicians and artists can enjoy sketching and calculating on paper with professional flair. The Chief Engineer Pad Backer Bundle includes the letter-size Pad Backer, Engineer Grid Pads (1/8-inch grid format of 8 squares per inch, 64 squares per square inch) and the Engineer Rollerball Pen in Moss Green. Optional 3-initial monogram is available on the pad backer only.
Explore more from our collection.





Reviews
There are no reviews yet.